The Kitchen: We have the fridge


The fridge I had written about not too long ago, but I took those words out of the posts before it came, was brought over a couple of days ago finally.

It’s nice. Nicer than our regular fridge, so it’s now our primary refrigerator. It’s a side-by-side, probably 25 cubic feet space inside. It has an ice maker, and ice and water through the freeser door … but that stuff isn’t hooked up yet. The fridge is in a temperary spot, and wil not be hooked up to water until the kitchen stuff is moved that needs to go, then we can do the plumbing that we need to do.

The color of it is white, and it’s just like our other fridge in that way, it’s that bumpy white finish. The housing for the ice/water on the door is discolored, and a bit cracked on one corner, but that’s rather “normal” in wear … plastic stuff like that goes ugly eventually in different ways, looking bad. The door could be replaced, for $400+ … ha ha ha. No way we NEED to do that. It’s not as clear whether or not we could replace just the housing for that area … but it’s fine the way it is, over all.

We also took out more of that wall we are removing. Piece by piece, slowly “just in case”, but it’s rather mostly sure that it’s not a load bearing wall. It’s just part of this whole remodel, slow and some here, some there, and by and by it’ll all get done. The cabinets I painted before may be far along now to be sanded and repainted now. That will be tested this coming week. Once I get that done it’ll be that the upper cabinets there will also be painted, and we can get things measured out and hang those there and get some electric done and a few other things moved too.

The wall by the steps that hugs the one end of the kitchen is a partial wall, and it’s loose … it moves too easily. We were going to make it a full height wall … so seeing how it really is it will be needed to be torn out and replaced totally. No big deal really.

So things are moving along. Slow, but moving. We have electric that we have to do, then plumbing … then it’ll really be moving … plumbing is the biggy … the thing that means we’ll have to move the sink, or get the bar sink and that inner L counter built and installed … or some configuration so that we have water and a sink to wash with there.

Right now we have nice opening in the wall though, we have two ways to go into the kitchen, so when I am at the stove I don’t have to have people going past me … everything isn’t in place as it’ll be later, but this set up is more like it than not … I’ll have the stove there abouts, and there will be that other way of coming in and out of the kitchen area down near the door to the garage. It’s coming together and even though it’s all in chaos, it’s so much nicer than when we had vinyl flooring and everything in it’s place and a little tiny living room with carpet right next to it with that wall between.

We have a dining/living space now with a large opening to the kitchen, no large wall between. It’s like there is more space now, and we will have more when it’s further along. It’s all about how things are in a room. What place they sit in means a lot. I don’t do that chinese FS stuff, but what I do know about it seems to have “common sense” in some of it. Flow and light and air, they say the energy flows or doesn’t based on what’s placed where, how the room is built, etc.

Our front door opened and right there the house went right back to the french doors, it felt like everything went right out of the house, right away. We took those French Doors out and a board is there now. That’s the place where our kitchen is moving to, it feels so much better. There is no “right out the door” feeling there now. It’s cosy. That’s just one of the things that I felt interesting to mention, it’s just regular “how space feels” that you can figure out without mystical religious symbolism 😉

I have to download pictures off the camera tomorrow, then I’ll take some pictures of the new fridge and get them up here.

,

2 responses to “The Kitchen: We have the fridge”

Leave a Reply

Your email address will not be published. Required fields are marked *